News

News

Current: Breaking ground, coming home for sports apparel, training business

A sports apparel, recreation and training business is making a move from Burnsville to the owner’s hometown of Rosemount, with a new building off State Highway 3 on the city’s south side.

CA Gear, or Custom Apparel, Inc., broke ground with much fanfare recently for a multi-function facility designed by CNH Architects.

“With this as the permanent home for his business, it was important to make sure that the design fit every aspect of Owner Nate Bry’s program,” said Senior Architectural Designer Al Tsai with CNH. Within the structure of classic black precast walls and a metal-clad main entry, there are two sides to the operation, he explains.

One will house the sports apparel manufacturing functions of embroidery and assembly, as well as a store. The other will feature batting lanes, concessions and training space for “elite” and “elite-to-be” athletes, said Tsai.

There’s a lot of community support behind Bry’s effort. He was surrounded at the groundbreaking by family and friends. The state representative for the area and the Rosemount mayor also came to show appreciation. Tsai said the contractor indicated that it was the best attended groundbreaking he had ever seen.

The designer was struck by Bry’s passion for mentorship, support and engagement of local youth athletics. The facility is under construction at 15641 Canada Circle in Rosemount.

Share this:

Current: Breaking ground, coming home for sports apparel, training business

A sports apparel, recreation and training business is making a move from Burnsville to the owner’s hometown of Rosemount, with a new building off State Highway 3 on the city’s south side.

CA Gear, or Custom Apparel, Inc., broke ground with much fanfare recently for a multi-function facility designed by CNH Architects.

“With this as the permanent home for his business, it was important to make sure that the design fit every aspect of Owner Nate Bry’s program,” said Senior Architectural Designer Al Tsai with CNH. Within the structure of classic black precast walls and a metal-clad main entry, there are two sides to the operation, he explains.

One will house the sports apparel manufacturing functions of embroidery and assembly, as well as a store. The other will feature batting lanes, concessions and training space for “elite” and “elite-to-be” athletes, said Tsai.

There’s a lot of community support behind Bry’s effort. He was surrounded at the groundbreaking by family and friends. The state representative for the area and the Rosemount mayor also came to show appreciation. Tsai said the contractor indicated that it was the best attended groundbreaking he had ever seen.

The designer was struck by Bry’s passion for mentorship, support and engagement of local youth athletics. The facility is under construction at 15641 Canada Circle in Rosemount.

Share this:
Scroll to Top

BURNSVILLE FIRE STATION NO. 1

CNH’s largest fire station to date, the City of Burnsville’s Fire Station No. 1 is home to a crew of all full-time firefighters and more than 44,000 SF with 10 apparatus bays. Firefighter safety was one of nine top priorities for the station. Multiple contamination zones and a designated de-contamination area will allow firefighters to keep contaminated equipment and clothing in the apparatus bay until decontaminated. Another priority in the design was firefighter mental health. A warning system that slowly ramps up with alert tones and lighting while only alerting responding staff ensures firefighters are not awoken in an abrupt manner. The station includes areas for relaxation with different lighting to promote natural sleep rhythms, as well as a yoga studio and meditation garden. Extensive firefighter training features including Firefighter 1 and advanced training elements are another highlight of the station.