Station #2 is being completely rebuilt and Fire Station #3 is being remodeled with an addition. Along with dorms and dedicated turnout gear spaces, a plethora of on-site training opportunities are planned for both stations. Learn more about the fire station designs here.
Â

Station #2 second floor gypsum board and exterior spray insulation 
Station #2 apparatus bay trench drains and vapor barrier 
Station #3 second floor HVAC and piping 
Station #2 barrel vault / tower spray insulation
Â
Â
Â
Completion is slated for June at Station #3 and October at Station #2.
View drone footage, courtesy of RJM Construction, of each site: